Project Overview

Extreme Plumbing & Gas was proud to be involved in this stunning architectural new build in Te Arai, delivering the complete plumbing and gas fitting package from the ground up.

Working alongside Green Build Projects, our team managed every stage of the installation, from under-slab plumbing and drainage through to pipe-out, final fixture installation and commissioning.

The home features a beautifully designed kitchen, scullery, laundry and three bathrooms, all requiring careful planning and precise installation to complement the architectural design and high-end finishes.

The project also included the installation of two mains pressure electric hot water cylinders, strategically positioned at opposite ends of the home to minimise hot water delivery times and improve everyday convenience.

Additional works included the installation of water pumps, filtration systems and an LPG gas fireplace, providing a complete plumbing and gas solution tailored to the property.

CASE STUDY –  TE ARAI

Challenges

One of the standout aspects of this project was the exceptional planning and preparation undertaken before construction began.

Unlike many new builds, where site conditions and changing layouts can present challenges, this project was extremely well organised from the outset.

Accurate string lines identifying all internal wall positions, along with established external boxing, provided reliable reference points for our under-slab plumbing installation. This allowed our team to measure and position pipework with precision, ensuring services came through the centre of the timber-framed walls exactly where required.

Being an Auckland-based plumbing company working in Te Arai also required careful scheduling and communication. Close coordination with the builder, interior designer and homeowners ensured each stage was completed at the appropriate time, reducing unnecessary travel and maintaining a smooth construction programme.

The result was an efficient installation process with minimal disruption or rework.

CASE STUDY –  TE ARAI

Plumbing & Gas Solutions

Attention to detail and early collaboration were key to achieving the high-quality finish throughout this home.

Before beginning the plumbing pipe-out stage, we arranged a detailed site walkthrough with Green Build Projects, the tiler and the homeowner. Rather than simply installing pipework to standard measurements, we took the time to discuss and confirm the finer details of every bathroom installation, including:

  • Exact shower mixer positions and installation heights.
  • Vanity heights and basin mixer locations.
  • Shower rail positioning to suit the homeowners’ preferences.
  • Alignment of tapware with grout lines and tile centres.
  • Individual requirements to ensure fixtures were positioned for both practicality and visual appeal.

Working directly with the tiler allowed us to establish the finished tile layouts before positioning our plumbing fittings. Where appropriate, mixers and other fixtures were centred within individual tiles or aligned with grout lines to achieve a balanced, seamless finish.

These small details make a significant difference in a high-end architectural home. Involving the homeowners throughout this process also gave them the opportunity to personalise fixture heights and locations to suit their needs.

This collaborative approach is something we bring to every project. Taking the time to get the set-out right before installation ensures everyone is working towards the same result and helps avoid costly changes later in construction.

CASE STUDY –  TE ARAI

Outcome & Results

The completed home is an outstanding example of what can be achieved through quality workmanship, thoughtful design and strong collaboration between trades.

From the carefully positioned plumbing fixtures to the beautifully finished bathrooms and interior spaces, every detail contributes to the overall quality of the home. We are incredibly proud to have played a part in bringing this architectural property to life.

For the homeowners, this project marked an exciting lifestyle change, moving away from city living to enjoy everything the Te Arai area has to offer. Seeing how happy they are with their new home makes the project even more rewarding for our team.

At Extreme Plumbing & Gas, we believe exceptional results start well before the first pipe is installed. Through detailed planning, clear communication and pride in our workmanship, we deliver plumbing and gas fitting solutions that complement the quality of the homes we work on.